Photographed stone-clad architectural façade with recessed windows in daylight

Solutions / Exterior

The building as a complete expression.

Engineering and material thinking for façades, structural elements and architectural envelopes.

Eight exterior systems

Structure, composites and envelope systems engineered together — from the frame to the glazed skin.

I

Structure first

Civil Work — solution imagery from the MAGNUM Company Profile 2025

0108

Civil Work

Concrete structures, steel structures, LGS, blockwork, plaster and screeding or self-leveling.

Scope

  • 01Concrete structures
  • 02Steel structures
  • 03LGS
  • 04Blockwork
  • 05Plaster
  • 06Screeding and self-leveling
II

Engineered composites

GRC — solution imagery from the MAGNUM Company Profile 2025

0208

GRC

Glass reinforced concrete for expressive exterior architecture.

GRP — solution imagery from the MAGNUM Company Profile 2025

0308

GRP

Glass reinforced polymer for adaptable architectural forms.

UHPC — solution imagery from the MAGNUM Company Profile 2025

0408

UHPC

Ultra-high-performance concrete as an architectural material solution.

III

Continuous surfaces

0508

Exterior Solid Surface

Continuous architectural surfaces for exterior applications.

Exterior Solid Surface — solution imagery from the MAGNUM Company Profile 2025
IV

Envelope systems

EIFS — solution imagery from the MAGNUM Company Profile 2025

0608

EIFS

Exterior insulation and finish systems for coordinated building envelopes.

Aluminum Cladding — solution imagery from the MAGNUM Company Profile 2025

0708

Aluminum Cladding

Detailed cladding solutions shaped around the exterior design.

V

The glazed envelope

Curtain Wall & Glass — solution imagery from the MAGNUM Company Profile 2025

0808

Curtain Wall & Glass

Glazed architectural envelopes with integrated detailing.

Engineering and material thinking — carried through the complete building envelope.

THE NEXT CHAPTER

LET'S BUILD SOMETHING EXCEPTIONAL.

Start a project