From knowledge to execution
MAGNUM Insights
A technical journal tracing ideas from line, model and material to the built site.
Journal · 01 — 16EXPLORE THE SUBJECTS
16 SELECTED READS
EIFS Explained: Building a High-Performance Exterior Envelope
An exterior wall is an assembly, not just a finish. The value of EIFS lies in the relationship between continuous insulation, a reinforced surface and precisely resolved interfaces—not in any single material alone.
5 MIN READREAD ARTICLE
01 — 16
THE NEXT CHAPTER




