
0108
Joinery
Wardrobes, kitchens, cabinetry, wall cladding, wood flooring, doors and upholstery.
Scope
- 01Wardrobes
- 02Kitchens
- 03Cabinetry
- 04Wall cladding
- 05Wood flooring
- 06Doors
- 07Upholstery

Solutions / Interior
Material, craft and technical precision come together across eight interior disciplines.
Eight interior disciplines
From joinery to the final finish, every surface is detailed, coordinated and delivered as one interior.

0108
Wardrobes, kitchens, cabinetry, wall cladding, wood flooring, doors and upholstery.
Scope

0208
Marble, raised access flooring, SPC and parquet, and carpet.

0308
Seamless architectural surfaces for considered interior environments.

0408
Precise material expression for demanding interior settings.
0508
Durable, detailed architectural metalwork.


0608
Refined ceiling solutions integrated with the spatial design.

0708
Ceilings, partitions, cornices, moldings and paneling.

0808
Traditional painting, decorative paints and wallpaper.
Material, craft and technical precision — carried through every interior discipline.
THE NEXT CHAPTER